Material Overview:
- Training material
- Language: English
- Solution: SNP
- Software Version: SCM 3.x to SCM 7.x
- Length: 49 pages
- Format: pdf
- Published On: 2011-07-09
Related Jobs:
SAP APO - Supply Network Planning Expert
Morristown (New Jersey, United States) SAP, APO, DP, SNP, BEST
Posted on: 18 Jun. 2013
SAP APO SNP Lead
Peoria (Illinois, United States) SAP, APO, SNP
Posted on: 30 May. 2013
SAP APO Consultant (SAP, APO, PP/DS, SNP, DP) - Contract - UK
United Kingdom SAP, APO, DP, SNP, PP
Posted on: 05 May. 2013
Related Materials:
SCM (APO) Supply Chain Planning Process Overview - Blueprint
Training material in English
By Virtegra Consulting BvSAP SCM (APO) Short Overview
Training material in English
By MatthieuSAP SCM: Applications and Modeling for Supply Chain Management (with BW Primer)
Paper book in English
By ExpertplugSNP, Deployment Heuristic, Deployment Customizing, ATD Categories, ATD Receipt, ATD Issues, Available to Deploy, Deployment Horizons, “Push Distribution” Rules, Fair Share Rules, /SAPAPO/SNP02, Deployment examples, Deployment issues
In this training, you will find a detailed description about the Deployment process in Supply Network Planning. All the settings to run a deployment are indicated, and the different parameters are explained. For the most important parameters, push distribution parameters and fair share rules, 18 examples of different cases provide clear insight on how these work.
- Deployment process concept
- Types of deployments
- Deployment Heuristics settings:
a. ATD Categories
b. Deployment Horizons
c. “Push Distribution” Rules
d. Fair Share Rules - Examples for all push distribution and fair share rules
- How to launch deployment?
- NOTE: SNP as input of TLB
- NOTE: Refresh when testing in interactive planning
SNP Deployment Heuristic – Detailed configuration - Presentation Preview Transcript
2. Types of Deployments
0 DEPLOYMENT HEURISTIC
o The deployment heuristic creates a distribution plan for one
product at one location.
0 If there is more supply than is necessary to meet demands, the
system uses push rules to determine the distribution plan.
0 However, if the available quantities are insufficient to fulfill
the demand, the system uses fair share rules to determine the
distribution plan.
0 Fair share and push rules are defined in the SNP deployment
profile and are described in details in the next slides.
3. Deployment Heuristic Settings
_________________________________________________________________________________________________________ __ ©
0 Available to Deploy (ATD) Quantities:
o “ATD Receipts” and “ATD Issues” control the Available to
Deploy (ATD) Quantity considered by the deployment
calculations:
x ATD Receipt: order types considered as available to be
deployed (stock, production...)
It ATD Issues: order types reducing ATD Quantity as already
counted as « Issues » (STOs, sales orders, forecast).
0 These Quantities are group of categories = order types
(stock, production orders, planned orders, forecast...)
3. Deployment Heuristic Settings
_________________________________________________________________________________________________________ __ ©
0 Available to Deploy (ATD) Quantities:
o ATD category groups are defined in the customizing for
SNP (under Basic Settings —> Maintain Cateqoru
- - .. ii. -
Groups) ::l=( View Category Groups . Overview
.
Display IMG ’
[Dialog Structure ‘ -
] l Existing so sets ||
Customer Reviews
Very nice overview of the deployment process. There are many examples, but I would have enjoyed a few more still. If you have time at some point to improve it it would be interesting.
Would also have enjoyed to have some hints about the TLB process... do you think you could provide this in another training?
Thanks,
David
Very nice doc, thanks
As Mr Kenneth I am still interested in extra information on the subject though ;)
Cheers
John